Swedish automaker Volvo has invested SEK 935 million (about $140 million) in a truck assembly plant in the central Russian city of Kaluga in the 55-hectare Kaluga South industrial park. The plant production capacity about 15 thousand Volvo trucks per year.

Activity:
Building & structural audit of a plant structures’ load-bearing capacity. Verified the building structures and design model calculations in Lyra software by Structural Engineers team. Conducted a number of investigation meetings with a final report to the Client.

Facilities:
Main production building, workshop for welding and painting cabins with an area of 25,000 sq.m., a finished products workshop with an area of 45,000 sq.m., a warehouse and office space. The staff numbers approximately 800 employees, infrastructure engineering facilities and networks.

Детали проекта:
Расположение:
Калуга, Россия
Площадь участка:
550 000 кв.м.
Площадь застройки:
45 000 кв.м.
Стоимость разработки:
140 миллионов долларов США
О КОМПАНИИEK Innovative Engineering
Компания по консалтингу, инжинирингу, проектированию, управлению строительными проектами и промышленному развитию.
НАШИ УСЛУГИКонсультации по управлению проектами, проектирование и разработка
СВЯЖИТЕСЬ С НАМИНаши офисы
188 Kilburn High Rd, Лондон NW6 4JD
1/12 Ul. Zofii Kossak-Szcuckiej, Wrocław 54-608, Dolnośląskie Województwo, Польша