Transport for London (TfL) has upgraded London Underground lines, significantly helping to increase capacity and improve the overall passenger experience. In particular, infrastructure projects were implemented, such as Wire Degradation for the phased replacement of existing cable routes, Compromised Overlaps, LED project to replace all lamps, Beth Track Diversity to install new assets at King’s Cross St. Pancras stations, DEV project on the introduction of a new relay including high-voltage and low-voltage distribution boards, and PCB project to remove hazardous acidic liquid at to DC distribution boards.
Activity:
General project management & consulting
Facilities:
London Underground stations + infrastructure including tunnels and equipment rooms, facilities and networks.
- Детали проекта:
- Расположение:
- Лондон, Великобритания
- Капитальные затраты проекта:
- более 2 млрд фунтов стерлингов